The projects of our company

Having knowledge and faith in our capabilities and guided by the modern requirements of the sector, we have established relationships of trust with clients both in the private and in the wider public sector.

With more than 30 years of experience and specialization in the most modern requirements, MARKOUDIS LTD carries out high quality projects that evolve and develop the sector of construction and infrastructure.

Among these projects are the following major projects of our company:

Construction of motorways

Demolition of buildings

Construction of Wind Farms

Construction of trenches with the method of retaining

Landscaping of large areas using machinery & explosives

Construction of pavements

Deep Excavations (Thessaloniki Metro)

Relocation of Networks

Construction of a hydroponic type greenhouse unit of an area of 110,000 square meters at Petrousa, Drama

A project in which the capabilities of our company were tested was the removal of 500,000 cubic meters of soil with the use of excavators and explosives.

Demolition of buildings at the Hellinikon Airport

With our many years of experience, reliability and consistency we managed to gain the trust of our partners and to be the company that would start the first demolitions of the buildings of the Hellinikon Airport.

Construction of a road section on the Ε-65 motorway

A project with great demands in which our company constructed a large section of the Ε-65 motorway from Anavra to Xyniada

The Thermi-Galatista Project

A project with special requirements and a short schedule which our company delivered 3 months early.

Construction of a Wind Farm at Distomo, Boeotia

Construction of roads and of 6 bases. A project with several particularities due to the difficulties encountered in the nature of the terrain.

The Katerini Project

Construction and widening of river beds with the use of machinery and the placement of Sarazaneti wire meshes in Katerini.

Construction of a Wind Farm at Pisoderi, Florina

Construction of roads and of 34 bases, a project in which, due to the limited time for its completion, our company used its own mechanical means in order to meet the requirements of the precise schedule of the 3-month project.

Thessaloniki Metro

When the requirements are high, we are ready to respond as in this particular project where the excavation reached up to 25 meters in depth.